Skip to content

Built in Prince Edward Island · Priced in Canadian dollars · Support from the people who built it

Drywall & finishing

The CRM that names the level of finish.

Daybook runs a drywall company end to end: the level of finish named at the walkthrough and the quote built from your own labelled price list; a finish walk-through — the level delivered, the raking-light check, the client’s sign-off — rides on every job type, and the job does not close without it; FLHA forms, clock-in and photos come from the crew’s phones. Then the invoice, with GST/HST by province.

The job “Trevor Raman — New construction” in Daybook, and its brief: “Work starts Monday, October 12”, an update from the crew, the access code pinned from the customer’s email, a short summary of where it stands, the key facts and what the customer asked for (each with the message it came from).

The rules the trade lives under

Built around the paperwork a drywall contractor already answers to.

  • The level of finish, delivered and signed for

    A new build, a basement development, renovation boarding and finishing, a repair or patch, a textured ceiling, an insulation and vapour barrier job and a commercial or steel-stud job do not close without the level of finish delivered, whether it was checked under a raking light, what was done, the photographs after and the client’s sign-off.

  • The insulation inspection, before the board

    The site measure and sheet count records what is on the walls now, the ceiling heights, the sheet count, the level of finish quoted, the access and protection, and whether an insulation inspection is needed before the board, with the photographs before and the crew lead’s sign-off. Attached to new builds, basements, renovations, insulation and commercial jobs.

  • Ontario’s rules for contracts signed at a client’s home

    A quote signed at an Ontario client’s home shows them their right to cancel for 10 days, and their copy is emailed with the last day to cancel.

  • Provincial OH&S hazard assessments (FLHA)

    FLHA forms in the crew app, on Crew and up: the hazards, the controls, the conditions and the crew on site, filled in on the phone at the start of the day and filed on the job the moment they land.

Daybook names these so you can see where it helps. It is not a compliance product: it does not work out a sheet count, certify a fire-rated assembly or test a wall for moisture or mould. The sheets record what was measured, done and signed for, the hazard assessment is yours to fill in, and your province has the last word.

Three things that go wrong

The headaches every drywall company knows.

Pricing a basement from the last one

Every quote starts as a copy of the last basement: the bulkheads forgotten, the stairwell scaffold left off, and the bin and the dump fees never billed.

In Daybook The quote builder prices from your own labelled list — boarding by the sheet, board, tape and finish by the square foot at the level, bead, bulkheads and arches by the foot, patches by the size, the scaffold by the day, the bin and the dump fees each on their own line — with the margin beside the price on every line.

Smooth, said nobody in writing

The client heard “smooth”, the painter expected a skim, and the quote never said. The argument starts when the eggshell goes on and the afternoon light comes through the window.

In Daybook The site measure records the level of finish quoted, the price list names the level on its lines, and the walk-through at the end asks which level was delivered and whether it was checked under a raking light, with the client’s sign-off. The job is not complete until it is answered.

Which stage is it at?

The builder calls to ask whether the taper can start, and the answer is somewhere in a text thread between the boarders.

In Daybook The stage log keeps an entry per stage — boarded, taped and coated, sanded, skimmed, primed, or held up — with the date, who was on site and the work done, and a place for the sheets hung, the issues and the photographs, filled in from the crew’s phones and on the job where the office can find it.

The brief

Everyone talks at once. The job gets one brief.

A job is a week of emails, texts, notes and updates from the crew. Daybook files each one on the job it belongs to and writes the brief: the gate code, the deadline, what the customer asked for, what you owe them and what they owe you — rewritten whenever something new arrives.

The brief and the Assistant

Texting comes with the top plan of every rate card (Company, for a trade), from a verified toll-free number of your own.

A job’s brief in Daybook: the gate code pinned at the top, a one-line summary, a time-sensitive deadline, key facts, what the customer requested, a suggestion, the next step and its date, and what is waiting on the customer.
1The gate code, pinned
2The deadline
3What the customer asked for
4What we owe, and the next step
5What the customer owes

A real capture of a contractor’s job. Daybook wrote every line of this brief from the messages on the job; only the five teal labels are added. A camp gets the same brief on a booking, a property manager on a work order.

The customerThe customer, textingThe officeA crew memberA crew memberA crew member
  • Our furnace keeps shutting offThe customer, by email
  • Side-wall vent. Narrow doorThe crew, from the site
  • Your quote is attachedThe office, by email
  • 3 photosThe crew, from the site
  • Done before the 24th?The customer, by text
  • Gate code 4471. Mind the dogThe office, to the crew
  • Checklist doneThe crew, from the site
  • The brief’s access code on a phone: 4471, with the customer’s own words — “The side gate code is 4471 — please close it behind you, we have a dog.”

    The gate code, pinned. Said once in an email, and now at the top of the job for the crew.

  • The brief’s time-sensitive line on a phone: send the thermostat finishes to Priya so she can sign and pay the deposit, by Tuesday, October 13, with a Text client button.

    The deadline. What is time-sensitive, and by when.

  • What the customer requested, in the brief on a phone: the thermostat finishes, and confirming the old furnace is taken away, each from Priya Raman’s email.

    What the customer asked for. Each request, with the message it came from.

  • The next step, in the brief on a phone: send Priya the thermostat finish options and confirm the old furnace removal, with a Book visit button.

    What we owe, and the next step. One next step, and a button that starts it.

  • Waiting on the customer, in the brief on a phone: pick a thermostat finish, sign the quote and pay the deposit, with the risk under it.

    What the customer owes. So nobody chases the wrong person.

Real captures of a contractor’s job. Daybook wrote every line of this brief from the messages on the job. A camp gets the same brief on a booking, a property manager on a work order.

The drywall toolkit.

On top of everything Daybook does for every one of its 44 trades — the full list is here — drywall gets its own words and tools: the visit before the quote is a site walkthrough; a labelled drywall price list in the quote builder; three drywaller’s sheets; and drafts, replies and job summaries that say board and hang, tape, mud and coat, sand and skim, the level of finish, corner bead, butt joint and tapered edge, Type X, MR board, poly, nail pop, popcorn and stipple the way a drywaller does.

The price list

Priced by the sheet, the square foot and the level.

Daybook gives you a labelled drywall price list to quote from: finishers, boarders and labourers by the hour, and the site measure and sheet count; boarding walls and ceilings by the sheet, 4 × 12s on their own line, board, tape and finish by the square foot at Level 3 or Level 4, taping and finishing only by the sheet, a Level 5 skim by the square foot, corner bead, bulkheads and curved work by the foot, access panels and the prime coat; popcorn and texture removal, knockdown and orange-peel texture; patches small and medium, large repairs and water damage by the square foot, nail pops and cracks by the room, plaster and bead repair, the minimum charge; batts, poly and acoustic sealant, sound insulation and spray foam; steel stud by the foot, Type X fire-rated assemblies, acoustic and demising walls, T-bar ceilings and shaft wall, the after-hours premium; board, compound, tape, screws, bead and primer; a drywall lift, a baker scaffold and a dustless sander by the day; mobilization and site protection, haul-away, the bin and dump fees. Your own prices go on it, and every quote and invoice reads from it.

By the level the sheet, the square foot and the level of finish — each a labelled line, priced from your own list

The price list

Priced by the sheet, the square foot and the level.

Daybook gives you a labelled drywall price list to quote from: finishers, boarders and labourers by the hour, and the site measure and sheet count; boarding walls and ceilings by the sheet, 4 × 12s on their own line, board, tape and finish by the square foot at Level 3 or Level 4, taping and finishing only by the sheet, a Level 5 skim by the square foot, corner bead, bulkheads and curved work by the foot, access panels and the prime coat; popcorn and texture removal, knockdown and orange-peel texture; patches small and medium, large repairs and water damage by the square foot, nail pops and cracks by the room, plaster and bead repair, the minimum charge; batts, poly and acoustic sealant, sound insulation and spray foam; steel stud by the foot, Type X fire-rated assemblies, acoustic and demising walls, T-bar ceilings and shaft wall, the after-hours premium; board, compound, tape, screws, bead and primer; a drywall lift, a baker scaffold and a dustless sander by the day; mobilization and site protection, haul-away, the bin and dump fees. Your own prices go on it, and every quote and invoice reads from it.

  • A labelled starter price list on day one, with your own prices on it
  • Labour, boarding and finishing, ceilings, repairs, insulation and vapour barrier, commercial, materials, equipment, fees and disposal
  • The margin beside the price on every line, and the estimated cost for your eyes only — never on the PDF
  • Quotes and invoices in a drywaller’s words — approved, or sent back for a revision, in the client’s portal
  • Your own sheet and square-foot rates beside the starter list — Crew and up
  • A price book that updates when you scan a supplier invoice — Crew and up
Quoting

The request

A request becomes a site walkthrough. Then a quote.

Every request lands on one board with its job type — a basement, a new build, a popcorn ceiling, a patch — and one button: Schedule a walkthrough. Walk the site, count the sheets, and build the quote on the job; when the customer approves it in their portal, the job is won and ready to schedule.

The requests board in Daybook: “Simone Mitchell — Basement development” and “Grace Stavros — Commercial & steel stud”.

The request

A request becomes a site walkthrough. Then a quote.

Every request lands on one board with its job type — a basement, a new build, a popcorn ceiling, a patch — and one button: Schedule a walkthrough. Walk the site, count the sheets, and build the quote on the job; when the customer approves it in their portal, the job is won and ready to schedule.

  • The requests board in Daybook: “Simone Mitchell — Basement development” and “Grace Stavros — Commercial & steel stud”.

    Every request, on your phone. Call the client or email them from the card, and book them in with the button under it.

  • The job on its page in Daybook, its steps across the top: Schedule, Start, Finish, Invoice and Get paid.

    The job’s own page. Its steps across the top, the client a call or a text away, and its photos, notes and messages a swipe apart.

  • A finished job in Daybook: Job finished, Generate warranty and Closeout.

    Finished. Every step ticked, and one tap starts the warranty from the job and its quote — nothing reaches the client until you send it.

  • Seven job types: new construction, basement development, renovation boarding & finishing, repair & patch, textured ceilings, insulation & vapour barrier, commercial & steel stud
  • A basement boarded from bare studs is filed as a basement development even when a patch is mentioned, and insulation somebody else put in does not make it an insulation job — sorted for you
  • Schedule the site walkthrough from the request — and plan the day’s route from the same board
  • Not viewed, walked, quoted and lost: where every request stands, at a glance
  • Requests from your website’s quote form land here as real requests, with the job address on them
Scheduling

The paperwork

Three sheets, written for drywallers.

A site measure and sheet count for the walk before the quote. A stage log for every stage from the board to the prime coat. A finish walk-through and sign-off for the light check at the end. All three attach themselves to the right jobs, and the walk-through will not let one close unfinished.

The checklists in Daybook: “Site measure & sheet count” and “Stage log”.

The paperwork

Three sheets, written for drywallers.

A site measure and sheet count for the walk before the quote. A stage log for every stage from the board to the prime coat. A finish walk-through and sign-off for the light check at the end. All three attach themselves to the right jobs, and the walk-through will not let one close unfinished.

  • Site measure & sheet count: what is on the walls now, the ceiling heights, the sheet count, the level of finish quoted, a place for the board, the access and protection, whether an insulation inspection is needed before the board, photos before, the crew lead’s sign-off
  • Stage log: the date, the stage — boarded, taped and coated, sanded, skimmed, textured, primed, or a delay — who was on site, the sheets hung that day, the work done, issues and notes, photos
  • Finish walk-through & sign-off: the level of finish delivered, whether it was checked under a raking light, the touch-ups and the date they will be done by, what was done — the dust vacuumed, the debris removed, the prime coat on, ready for the painter — after photos, the client’s sign-off
  • Attached to the right job types automatically — Crew and up
  • Yours to edit, and you can add your own
The crew app

Safety on site

The FLHA, filled in on the phone. Filed before the first sheet goes up.

Pick the job and the address and the crew come with it; the day’s conditions, each task with its hazard and its control — submitted from the phone at the start of the day and on the job’s record the moment it lands. Then clock-in, checklists and photos, with no signal if it comes to that.

An FLHA in the crew app, “Board the ceilings off the lift, then tape and first coat”: the task with its hazard and its control, and the crew on site under it.

Safety on site

The FLHA, filled in on the phone. Filed before the first sheet goes up.

Pick the job and the address and the crew come with it; the day’s conditions, each task with its hazard and its control — submitted from the phone at the start of the day and on the job’s record the moment it lands. Then clock-in, checklists and photos, with no signal if it comes to that.

  • The crew app’s home: a greeting by name, then Submit hours, FLHA, My jobs and More, and the jobs on the go below them, each with Add update.

    Their day. Hours, the FLHA and their jobs a tap away — and an update from a job on the go goes straight to the office.

  • A crew member’s list in the crew app, 11 active: “Emma Thibault — Repair & patch” and “Marcus MacNeil — Textured ceilings” among them, each with its address and its time.

    Their jobs. Every job they’re on, with its address, its booked day and a chat with the office.

  • An FLHA in the crew app, “Board the ceilings off the lift, then tape and first coat”: the task with its hazard and its control, and the crew on site under it.

    Before the work starts. Pick the job and the site, its contact and the crew fill in; they add each task with its hazard and its control, and submit it from the phone.

  • FLHA forms on Crew and up: job, site, conditions, tasks with hazard and control, the crew on site
  • Clock-in and timesheets from the phone in their pocket
  • Checklists filled in on the job — with a signature if you want one
  • Photos taken where there is no signal, filed when it returns
The crew app

Getting paid

Invoiced off the quote. Closed out with a review request.

The invoice is raised off the quote the customer approved — all of it, the part that is finished, or the extra work approved on top. A reminder you set once does the following-up, with a Pay Now link; e-transfers are matched to their invoices for you to confirm. And when the job is finished, its page offers the warranty and closeout package and a review request.

A finished job in Daybook: Job finished, Generate warranty and Closeout.

Getting paid

Invoiced off the quote. Closed out with a review request.

The invoice is raised off the quote the customer approved — all of it, the part that is finished, or the extra work approved on top. A reminder you set once does the following-up, with a Pay Now link; e-transfers are matched to their invoices for you to confirm. And when the job is finished, its page offers the warranty and closeout package and a review request.

  • An invoice off the approved quote — all of it, the finished part, or the extra work approved on top
  • Change orders for the work the customer adds after the quote
  • An overdue invoice chases itself, with a Pay Now link
  • E-transfer matched for you to confirm; cards online; EFT
  • A finished job offers the warranty and closeout package, and a review request
  • GST/HST by province, and the Sales Tax report ready for filing
Invoicing & payments

The crew

The phone already in their pocket.

Field seats are free and unlimited on Crew and Company, so every boarder, taper and labourer has the app: the day’s jobs, clock-in, the FLHA, the checklists, the photos — and the office sees it the moment it lands.

  • A crew member’s list in the crew app, 11 active: “Emma Thibault — Repair & patch” and “Marcus MacNeil — Textured ceilings” among them, each with its address and its time.
  • The crew app’s home: a greeting by name, then Submit hours, FLHA, My jobs and More, and the jobs on the go below them, each with Add update.
  • The job on its page in Daybook, its steps across the top: Schedule, Start, Finish, Invoice and Get paid.
  • The checklists in Daybook: “Site measure & sheet count” and “Stage log”.

The economics

Priced on the office. Free for the crew.

Most field-service software charges by the head, in another currency. Daybook charges the office seats, in Canadian dollars, and leaves the people hanging the board alone.

Workflow Field-service platforms priced per user Daybook
Currency Often billed in US dollars — the exchange rate and your card’s foreign fee ride along. Canadian dollars. Every plan, every add-on, printed on the pricing page.
The crew Typically an extra monthly fee for every field user past the plan’s cap. Field seats free and unlimited on Crew and Company — every boarder, taper and labourer gets the app.
Drywall tools A generic quote form; the price list lives in a spreadsheet. A labelled drywall price list in the quote builder, three drywaller’s sheets, and drafts and replies in a drywaller’s words.
Canadian tax and mileage Usually an accounting add-on, or by hand. GST/HST by province on every invoice, the Sales Tax report, a mileage log at your own rate, receipts read for you.
Your website Usually a separate builder, or a designer. A drywall site template on every plan, with a levels-of-finish page and a quote-request form that mints a real lead.

Nothing here is a discount, and there is no setup fee.

Three plans, priced in CAD.

Drywall runs on the trades rate card — every plan the same app, the office seats counted and the crew free from Crew up. Solo $99 / Crew $249 / Company $449 a month CAD. Office seats included on every plan. Field seats are free and unlimited on Crew and Company. Crew and Company include selling online, and Company also includes your own domain and texting — a plan without them can add them.

  • Solo — $99/mo CAD · 1 seat · no additions · Start on Solo
  • Crew — $249/mo CAD · 3 office seats · +$39/mo each after · Start on Crew
  • Company — $449/mo CAD · 10 office seats · +$39/mo each after · Start on Company

Start the free trial on CrewSee the plans

Switching

Moving from a spreadsheet, or from another platform.

There is no importer for another product’s export, and the page does not pretend there is. What there is gets a drywall company running in an afternoon.

Bring your client list

Upload a CSV or paste it in — names, phones, emails, addresses — and the clients are there. A QuickBooks client list imports straight across.

Put your prices on the list

The drywall price list is already labelled, from the boarder’s hour to a sheet of Type X and a box of compound. Type your own prices in — or, on Crew and up, scan a supplier invoice and the price book fills with your real costs.

Your website, live day one

The drywall template is already written for the work, with a levels-of-finish page — your photographs and your words go in, and the quote-request form drops leads straight into Daybook.

Questions drywall companies ask.

Is there a drywall estimator?

No — the builder prices from your own labelled list, and there is no takeoff that works out the quantities. You count the sheets, the square feet and the feet of bead; the list carries boarding by the sheet, board, tape and finish by the square foot at Level 3 or Level 4, the Level 5 skim, ceilings, patches and water damage, insulation and poly, steel stud and T-bar, with your own prices on it.

Which jobs will it not let me close?

Every drywall job type — new construction, basement development, renovation boarding and finishing, repair and patch, textured ceilings, insulation and vapour barrier, commercial and steel stud — carries the finish walk-through and sign-off: the level of finish delivered, whether it was checked under a raking light, what was done, the photographs after and the client’s sign-off. It is yours to edit.

Does it keep the level of finish on the job?

Yes. The site measure records the level of finish quoted — Level 3, Level 4, a Level 5 skim or texture — the price list names the level on its lines, and the walk-through at the end asks which level was delivered. Daybook does not inspect a wall: the raking-light check is yours, and the sheet asks whether it was done.

Can I bring my own prices?

Yes. Scan a supplier invoice and the price book updates; put your own sheet and square-foot rates alongside the starter list; set your own labour rates and markups. The quote builder prices from your numbers, not ours.

What does a taper cost?

Nothing on Crew and Company — field seats are free and unlimited. The office seats are what is counted, and the pricing page prints exactly how many each plan includes.

Does it work in a basement with no signal?

Clock-in, checklists and photos work with no signal and file themselves when the signal returns. The office sees them the moment they land.

Bring a real basement. Watch it priced.

Your own numbers beat any feature list — start the trial, count one basement and price it from your own list.

14-day free trial · No credit card · Bring your client list