Skip to content

Built in Prince Edward Island · Priced in Canadian dollars · Support from the people who built it

Roofing

The CRM that quotes by the square.

Daybook runs a roofing company end to end: put in the squares and the layers to tear off, and the quote works out the bundles, the rolls, the loads and the roofer hours from your own prices; a completion and cleanup sheet — the magnet sweep, the gutters, the bin — rides on every install, and the job does not close without it; FLHA forms, clock-in and photos come from the crew’s phones. Then the invoice, with GST/HST by province.

The job “Ana Nguyen — Flat / low-slope” in Daybook, and its brief: “Work starts Monday, October 12”, an update from the crew, the access code pinned from the customer’s email, a short summary of where it stands, the key facts and what the customer asked for (each with the message it came from).

The rules the trade lives under

Built around the paperwork a roofing contractor already answers to.

  • The cleanup, before the job is done

    A shingle reroof, a flat or metal roof and a new build do not close without whether the magnet sweep was done and the nails picked up, whether the gutters were cleared, and whether the tear-off was hauled and the bin removed.

  • What an insurer asks for after a storm

    The storm damage report records the date of the storm, the damage — hail, wind, a fallen tree, ice damming — what it did, and the photographs, with a place for the claim number. Attached to the job when a claim is in play.

  • Ontario’s rules for contracts signed at a client’s home

    A quote signed at an Ontario client’s home shows them their right to cancel for 10 days, and their copy is emailed with the last day to cancel.

  • Provincial OH&S hazard assessments (FLHA)

    FLHA forms in the crew app, on Crew and up: the hazards, the controls, the conditions and the crew on site, filled in on the phone at the start of the day and filed on the job the moment they land.

Daybook names these so you can see where it helps. It is not a compliance product: it does not inspect a roof, speak to an insurer or pull a permit. The sheets record what was found and what was done, the hazard assessment is yours to fill in, and your province has the last word.

Three things that go wrong

The headaches every roofing company knows.

Pricing a roof from the driveway

A reroof gets priced from the ground, the waste rounded and the bins guessed, and the number said on a Tuesday is the number you live with until the last bundle is up.

In Daybook Pick the job type, put in the squares and the layers to tear off, and the quote builder works out the bundles, the rolls, the loads and the roofer hours from your own prices — with the margin beside the price on every line.

A nail in the driveway on Sunday

The roof is done and it looks right. Then a tire finds a nail, the gutters are full of granules, and the bin is still on the lawn.

In Daybook The completion and cleanup sheet rides on every install: the magnet sweep, the gutters cleared, the tear-off hauled and the bin gone — and the job is not complete until it is answered.

The storm call with no paper behind it

After a hailstorm the phone rings all week, and the insurer wants a date nobody wrote down and photographs of every slope.

In Daybook The storm damage report keeps the date of the storm, the damage, what it did and the photographs, with a place for the claim number — on the job, where the office can find it.

The brief

Everyone talks at once. The job gets one brief.

A job is a week of emails, texts, notes and updates from the crew. Daybook files each one on the job it belongs to and writes the brief: the gate code, the deadline, what the customer asked for, what you owe them and what they owe you — rewritten whenever something new arrives.

The brief and the Assistant

Texting comes with the top plan of every rate card (Company, for a trade), from a verified toll-free number of your own.

A job’s brief in Daybook: the gate code pinned at the top, a one-line summary, a time-sensitive deadline, key facts, what the customer requested, a suggestion, the next step and its date, and what is waiting on the customer.
1The gate code, pinned
2The deadline
3What the customer asked for
4What we owe, and the next step
5What the customer owes

A real capture of a contractor’s job. Daybook wrote every line of this brief from the messages on the job; only the five teal labels are added. A camp gets the same brief on a booking, a property manager on a work order.

The customerThe customer, textingThe finished job: a house with its new roofFrom the site: nailing a row of shinglesFrom the site: new flashing at the chimneyFrom the site: hail damage on the old roof
  • Our furnace keeps shutting offThe customer, by email
  • Side-wall vent. Narrow doorThe crew, from the site
  • Your quote is attachedThe office, by email
  • 3 photosThe crew, from the site
  • Done before the 24th?The customer, by text
  • Gate code 4471. Mind the dogThe office, to the crew
  • Checklist doneThe crew, from the site
  • The brief’s access code on a phone: 4471, with the customer’s own words — “The side gate code is 4471 — please close it behind you, we have a dog.”

    The gate code, pinned. Said once in an email, and now at the top of the job for the crew.

  • The brief’s time-sensitive line on a phone: send the thermostat finishes to Priya so she can sign and pay the deposit, by Tuesday, October 13, with a Text client button.

    The deadline. What is time-sensitive, and by when.

  • What the customer requested, in the brief on a phone: the thermostat finishes, and confirming the old furnace is taken away, each from Priya Raman’s email.

    What the customer asked for. Each request, with the message it came from.

  • The next step, in the brief on a phone: send Priya the thermostat finish options and confirm the old furnace removal, with a Book visit button.

    What we owe, and the next step. One next step, and a button that starts it.

  • Waiting on the customer, in the brief on a phone: pick a thermostat finish, sign the quote and pay the deposit, with the risk under it.

    What the customer owes. So nobody chases the wrong person.

Real captures of a contractor’s job. Daybook wrote every line of this brief from the messages on the job. A camp gets the same brief on a booking, a property manager on a work order.

The roofing toolkit.

On top of everything Daybook does for every one of its 44 trades — the full list is here — roofing gets its own tools: a roof takeoff in the quote builder, a labelled roofing price list, three roofer’s sheets, and drafts, replies and job summaries that say squares, bundles, tear-off, underlayment, ice & water, drip edge, step flashing and pipe boots the way a roofer does.

The quote

Squares in. Bundles and roofer hours out.

Pick the job type — shingle reroof, repair or leak, flat or low-slope, metal, eaves, soffit and fascia, skylight, new construction — put in the squares and the layers to tear off, and the builder writes the lines: the tear-off and the loads to haul, the shingles by the bundle with the waste, the underlayment by the roll, the drip edge and the ridge cap, the flashing, the vents. No per-slope spreadsheet, and every number yours to change before it goes out.

By the square squares and layers in, bundles, rolls, loads and roofer hours out — priced from your own rates

The quote

Squares in. Bundles and roofer hours out.

Pick the job type — shingle reroof, repair or leak, flat or low-slope, metal, eaves, soffit and fascia, skylight, new construction — put in the squares and the layers to tear off, and the builder writes the lines: the tear-off and the loads to haul, the shingles by the bundle with the waste, the underlayment by the roll, the drip edge and the ridge cap, the flashing, the vents. No per-slope spreadsheet, and every number yours to change before it goes out.

  • Shingle reroof, repair and leak, flat and low-slope, metal, eaves, soffit and fascia, skylight and new construction job types
  • Tear-off from the squares and the layers — the roofer hours and the loads to haul worked out
  • Shingles by the bundle with the waste, underlayment by the roll, ice & water from the eaves and valleys, drip edge, starter and ridge cap from the lengths
  • Metal and membrane by the square foot; decking by the sheet; flashing, boots, vents, skylights, the hoist, fall protection and the permit each on its own line
  • The margin beside the price on every line, and the estimated cost for your eyes only — never on the PDF
  • Your own shingle lines beside the starter list on Crew and up; on Company, the visualizer tries shingle colours on the customer’s own photo
Quoting

The request

A request becomes a site visit. Then a quote.

Every request lands on one board with its job type — a reroof, a leak, a flat roof, the eaves — and one button: Schedule visit. Walk the roof, count the squares, and build the quote on the job; when the customer approves it in their portal, the job is won and ready to schedule.

The requests board in Daybook: “Dana Vandenberg — Skylight” and “Cedarline Realty — Flat / low-slope”.

The request

A request becomes a site visit. Then a quote.

Every request lands on one board with its job type — a reroof, a leak, a flat roof, the eaves — and one button: Schedule visit. Walk the roof, count the squares, and build the quote on the job; when the customer approves it in their portal, the job is won and ready to schedule.

  • The requests board in Daybook: “Dana Vandenberg — Skylight” and “Cedarline Realty — Flat / low-slope”.

    Every request, on your phone. Call the client or email them from the card, and book them in with the button under it.

  • The job on its page in Daybook, its steps across the top: Schedule, Start, Finish, Invoice and Get paid.

    The job’s own page. Its steps across the top, the client a call or a text away, and its photos, notes and messages a swipe apart.

  • A finished job in Daybook: Job finished, Generate warranty and Closeout.

    Finished. Every step ticked, and one tap starts the warranty from the job and its quote — nothing reaches the client until you send it.

  • Seven job types: shingle reroof, repair and leak, flat and low-slope, metal, eaves, soffit and fascia, skylight, new construction
  • A request that mentions a leak and a full replacement is filed as a reroof — the larger scope, sorted for you
  • Schedule the site visit from the request — and plan the day’s route from the same board
  • Not viewed, visited, quoted and lost: where every request stands, at a glance
  • Requests from your website’s quote form land here as real requests, with the job address on them
Scheduling

The paperwork

Three sheets, written for roofers.

A roof inspection for the walk before you quote. A storm damage report for the claim. A completion and cleanup sheet for the end of the job. The inspection and the cleanup attach themselves to the right jobs, and the cleanup will not let an install close unfinished.

The checklists in Daybook: “Roof inspection” and “Storm damage report”.

The paperwork

Three sheets, written for roofers.

A roof inspection for the walk before you quote. A storm damage report for the claim. A completion and cleanup sheet for the end of the job. The inspection and the cleanup attach themselves to the right jobs, and the cleanup will not let an install close unfinished.

  • Roof inspection: the pitch and layers, the squares, the issues found, whether the decking is sound, whether there is a leak inside, photos of each slope, the recommended scope
  • Storm damage report: the date of the storm, the damage type, a place for the claim number, the description, the photographs
  • Completion & cleanup: the magnet sweep, the gutters cleared, the tear-off hauled and the bin removed, the touch-ups, after photos, the customer’s sign-off
  • Attached to the right job types automatically — Crew and up
  • Yours to edit, and you can add your own
The crew app

Safety on site

The FLHA, filled in on the phone. Filed before anyone goes up.

Pick the job and the address and the crew come with it; the day’s conditions, each task with its hazard and its control — submitted from the phone at the start of the day and on the job’s record the moment it lands. Then clock-in, checklists and photos, with no signal if it comes to that.

An FLHA in the crew app, “Tear off and reshingle the north slope, then the ridge cap”: the task with its hazard and its control, and the crew on site under it.

Safety on site

The FLHA, filled in on the phone. Filed before anyone goes up.

Pick the job and the address and the crew come with it; the day’s conditions, each task with its hazard and its control — submitted from the phone at the start of the day and on the job’s record the moment it lands. Then clock-in, checklists and photos, with no signal if it comes to that.

  • The crew app’s home: a greeting by name, then Submit hours, FLHA, My jobs and More, and the jobs on the go below them, each with Add update.

    Their day. Hours, the FLHA and their jobs a tap away — and an update from a job on the go goes straight to the office.

  • A crew member’s list in the crew app, 11 active: “Luis Whitehorse — Eaves, soffit & fascia” and “Tom Achebe — Metal roofing” among them, each with its address and its time.

    Their jobs. Every job they’re on, with its address, its booked day and a chat with the office.

  • An FLHA in the crew app, “Tear off and reshingle the north slope, then the ridge cap”: the task with its hazard and its control, and the crew on site under it.

    Before the work starts. Pick the job and the site, its contact and the crew fill in; they add each task with its hazard and its control, and submit it from the phone.

  • FLHA forms on Crew and up: job, site, conditions, tasks with hazard and control, the crew on site
  • Clock-in and timesheets from the phone in their pocket
  • Checklists filled in on the roof — with a signature if you want one
  • Photos taken where there is no signal, filed when it returns
The crew app

Getting paid

Invoiced off the quote. Closed out with a review request.

The invoice is raised off the quote the customer approved — all of it, the part that is finished, or the extra work approved on top. A reminder you set once does the following-up, with a Pay Now link; e-transfers are matched to their invoices for you to confirm. And when the job is finished, its page offers the warranty and closeout package and a review request.

A finished job in Daybook: Job finished, Generate warranty and Closeout.

Getting paid

Invoiced off the quote. Closed out with a review request.

The invoice is raised off the quote the customer approved — all of it, the part that is finished, or the extra work approved on top. A reminder you set once does the following-up, with a Pay Now link; e-transfers are matched to their invoices for you to confirm. And when the job is finished, its page offers the warranty and closeout package and a review request.

  • An invoice off the approved quote — all of it, the finished part, or the extra work approved on top
  • Change orders for the work the customer adds after the quote
  • An overdue invoice chases itself, with a Pay Now link
  • E-transfer matched for you to confirm; cards online; EFT
  • A finished job offers the warranty and closeout package, and a review request
  • GST/HST by province, and the Sales Tax report ready for filing
Invoicing & payments

The crew

The phone already in their pocket.

Field seats are free and unlimited on Crew and Company, so every roofer and labourer has the app: the day’s jobs, clock-in, the FLHA, the checklists, the photos — and the office sees it the moment it lands.

  • A crew member’s list in the crew app, 11 active: “Luis Whitehorse — Eaves, soffit & fascia” and “Tom Achebe — Metal roofing” among them, each with its address and its time.
  • The crew app’s home: a greeting by name, then Submit hours, FLHA, My jobs and More, and the jobs on the go below them, each with Add update.
  • The job on its page in Daybook, its steps across the top: Schedule, Start, Finish, Invoice and Get paid.
  • The checklists in Daybook: “Roof inspection” and “Storm damage report”.

The economics

Priced on the office. Free for the crew.

Most field-service software charges by the head, in another currency. Daybook charges the office seats, in Canadian dollars, and leaves the people on the roof alone.

Workflow Field-service platforms priced per user Daybook
Currency Often billed in US dollars — the exchange rate and your card’s foreign fee ride along. Canadian dollars. Every plan, every add-on, printed on the pricing page.
The crew Typically an extra monthly fee for every field user past the plan’s cap. Field seats free and unlimited on Crew and Company — every roofer and labourer gets the app.
Roofing tools A generic quote form; the takeoff lives in a spreadsheet. A roof takeoff in the quote builder, a labelled roofing price list, three roofer’s sheets, and a visualizer on Company.
Canadian tax and mileage Usually an accounting add-on, or by hand. GST/HST by province on every invoice, the Sales Tax report, a mileage log at your own rate, receipts read for you.
Your website Usually a separate builder, or a designer. A roofing site template on every plan, with a storm-damage page and a quote-request form that mints a real lead.

Nothing here is a discount, and there is no setup fee.

Three plans, priced in CAD.

Roofing runs on the trades rate card — every plan the same app, the office seats counted and the crew free from Crew up. Solo $99 / Crew $249 / Company $449 a month CAD. Office seats included on every plan. Field seats are free and unlimited on Crew and Company. Crew and Company include selling online, and Company also includes your own domain and texting — a plan without them can add them.

  • Solo — $99/mo CAD · 1 seat · no additions · Start on Solo
  • Crew — $249/mo CAD · 3 office seats · +$39/mo each after · Start on Crew
  • Company — $449/mo CAD · 10 office seats · +$39/mo each after · Start on Company

Start the free trial on CrewSee the plans

Switching

Moving from a spreadsheet, or from another platform.

There is no importer for another product’s export, and the page does not pretend there is. What there is gets a roofing company running in an afternoon.

Bring your client list

Upload a CSV or paste it in — names, phones, emails, addresses — and the clients are there. A QuickBooks client list imports straight across.

Put your prices on the list

The roofing price list is already labelled, from the roofer’s hour to a bundle of ridge cap and a load of tear-off. Type your own prices in — or, on Crew and up, scan a supplier invoice and the price book fills with your real costs.

Your website, live day one

The roofing template is already written for the work, with a storm-damage page — your photographs and your words go in, and the quote-request form drops leads straight into Daybook.

Questions roofing companies ask.

How does it work out the shingles?

From what you measure. Put in the squares and the layers to tear off and the quote builder works out the tear-off hours and the loads to haul, the bundles with the waste and the hours to lay them, and the rolls of underlayment; ice & water goes by the length of the eaves and valleys, starter, drip edge and ridge cap by the foot, metal and membrane by the square foot. Every number is yours to change before the quote goes out.

Which jobs will it not let me close?

A shingle reroof, a flat or metal roof and a new build carry the completion and cleanup sheet: whether the magnet sweep was done and the nails picked up, whether the gutters were cleared, and whether the tear-off was hauled and the bin removed. It is yours to edit.

Does it handle insurance claims?

It keeps the record a claim asks for: the storm damage report has the date of the storm, the damage, the description and the photographs, with a place for the claim number. Daybook does not speak to an insurer or file a claim.

Can I bring my own prices?

Yes. Scan a supplier invoice and the price book updates; put your own shingle lines alongside the starter list; set your own labour rates and markups. The quote builder prices from your numbers, not ours.

What does a roofer cost?

Nothing on Crew and Company — field seats are free and unlimited. The office seats are what is counted, and the pricing page prints exactly how many each plan includes.

Does it work on a roof with no signal?

Clock-in, checklists and photos work with no signal and file themselves when the signal returns. The office sees them the moment they land.

Bring a real roof. Watch it quoted.

Your own numbers beat any feature list — start the trial, count the squares and let the takeoff price it.

14-day free trial · No credit card · Bring your client list